WGXC-90.7 FM

Maintenance work to cause delays on I-90 in Mass.

Jul 11, 2022 12:45 am

The Berkshire Eagle is reporting that motorists on I-90 in Becket and Lee, Mass., are being advised to expect temporary lane closures this week due to overnight guardrail repairs and daytime bridge repairs, according to the Massachusetts Department of Transportation. The guardrail repairs will happen on both eastbound and westbound I-90 from mile marker 8 to mile marker 14 in Lee and Becket and the bridge repairs will take place from mile marker 10 to mile marker 12. The nighttime work is slated to begin on July 11, and conclude on July 15. It will begin each night at 7 p.m. each night and conclude at 5 a.m. the next morning. The daytime work will be done on Monday beginning at 7 a.m. and conclude by 4 p.m. that same day. The work will require temporary lane closures and appropriate signage, law enforcement details and messaging will be in place to guide drivers through the work area. Drivers should expect delays, reduce speed and use caution. Read the full story in The Berkshire Eagle.

Wave Farm / WGXC Acra Contact Info
info@wavefarm.org
info@wgxc.org
Mailing: PO Box 13 Acra, NY 12405
Main Office / Acra Studio
(518) 622-2598
WGXC Office
(518) 697-7400
WGXC Hudson Studio
(518) 828-0290
WGXC Feedback
(518) 212-7509 feedback@wgxc.org
Wave Farm / WGXC Acra Studio: 5662 Route 23 Acra, NY 12405
WGXC Hudson Studio: 369 Warren St. Hudson, NY 12534