WGXC-90.7 FM

Work narrows lanes on Rip Van Winkle Bridge until May 26

Apr 17, 2019 12:11 am
The New York State Bridge Authority announced April 16 on both its Twitter and Facebook pages road work on the Rip Van Winkle Bridge for the next month. The road work begins April 17 and continues through May 26, with narrow lanes only 10'6" wide. Drivers are urged to use caution and wide loads are prohibited during the work.
Wave Farm / WGXC Acra Contact Info
info@wavefarm.org
info@wgxc.org
Mailing: PO Box 13 Acra, NY 12405
Main Office / Acra Studio
(518) 622-2598
WGXC Office
(518) 697-7400
WGXC Hudson Studio
(518) 828-0290
WGXC Feedback
(518) 212-7509 feedback@wgxc.org
Wave Farm / WGXC Acra Studio: 5662 Route 23 Acra, NY 12405
WGXC Hudson Studio: 369 Warren St. Hudson, NY 12534