WGXC-90.7 FM

Great Barrington road construction on both ends of town

Mar 24, 2021 5:31 am

Heather Bellow reports for the Berkshire Eagle that the main entrance to Great Barrington on the south side of town will be under construction for the next two years. Massachusetts Department of Transportation workers will begin construction at the intersection of Routes 7 and 23 this week, a $2 million project to replace the intersection with a roundabout. This is the main route into Great Barrington from New York along Route 23, and Route 7 becomes the town's main street. Meanwhile, at the other end of Great Barrington, the DOT's repair of the Brown Bridge on Route 7 is now painted red, and construction work there will be completed in June. Read more about this story in the Berkshire Eagle.

Wave Farm / WGXC Acra Contact Info
info@wavefarm.org
info@wgxc.org
Mailing: PO Box 13 Acra, NY 12405
Main Office / Acra Studio
(518) 622-2598
WGXC Office
(518) 697-7400
WGXC Hudson Studio
(518) 828-0290
WGXC Feedback
(518) 212-7509 feedback@wgxc.org
Wave Farm / WGXC Acra Studio: 5662 Route 23 Acra, NY 12405
WGXC Hudson Studio: 369 Warren St. Hudson, NY 12534