WGXC-90.7 FM

EPA will start Hudson River PCB study slightly earlier

Dec 23, 2015 12:04 am
Brian Nearing reports in Capitol Confidential, the Times-Union blog, that the U.S. Environmental Protection Agency agreed Dec. 22 to speed up its study of whether the six-year Hudson River dredging project by General Electric was effective. Instead of starting the federal study in 2017, it will begin in 2016. GE still gets to disassemble a PCB-processing plant in Fort Edward that was used to remove the dangerous chemicals from the river. “We are encouraged and cautiously optimistic,” said Ned Sullivan, president of Scenic Hudson. Read the full story at Capitol Confidential.
Wave Farm / WGXC Acra Contact Info
info@wavefarm.org
info@wgxc.org
Mailing: PO Box 13 Acra, NY 12405
Main Office / Acra Studio
(518) 622-2598
WGXC Office
(518) 697-7400
WGXC Hudson Studio
(518) 828-0290
WGXC Feedback
(518) 212-7509 feedback@wgxc.org
Wave Farm / WGXC Acra Studio: 5662 Route 23 Acra, NY 12405
WGXC Hudson Studio: 369 Warren St. Hudson, NY 12534